![]() |
Vesalius Kazakhstan |
SAND/GRAVEL |
| The second Tyne Vehicle Tunnel was constructed by lowering prefabricated
sections into a trench. The cutter dredger Vesalius cut the trench - later the tunnel was buried by the dredger Alexander von Humboldt |
||
![]() |
||
| Vesalius working on the new Tyne Tunnel - November 2009 (See also 'Second Tunnel' section in SHIPS) |
||
![]() |
||
| Vesalius spanning the river | ||